⚡ SCADA/EMS | AGC | WAMS | IEC 61850 | IEC 60870-5-104

توزیع برق و دیسپاچینگ

Energy Management System & Power Grid Dispatching

سیستم مدیریت انرژی یکپارچه | کنترل فرکانس AGC/LFC | پایش گسترده WAMS/PMU | تحلیل امنیت N-1 | Economic Dispatch | State Estimation
رقیب Siemens Spectrum Power | ABB Network Manager | GE Grid Solutions

18
Subsystem
50Hz
Frequency
<100ms
SCADA Scan
N-1
Security
PMU
Synchrophasor
61850
IEC Standard
AGC
Auto Control
99.99%
Availability
📊 System Overview

نمای کلی شبکه برق

Real-time Grid Status | SCADA Integration | 1-Second Refresh

4,850
MW Generation
↑ 2.3%
📊
4,720
MW Demand
↑ 1.8%
🔄
50.02
Hz Frequency
±0.02
📈
130
MW Reserve
2.7%
🔌
400
kV Voltage
±1%
⚖️
+0.02
ACE MW
Normal
🔥
4.2
% Losses
↓ 0.1%
N-1
Security
Secure
📐 Single Line Diagram

نمودار تک‌خطی تعاملی

Interactive SLD | Click on breakers to toggle | Real-time values

⚡ Power System SLD - Live
✓ All Buses EnergizedSCADA ConnectedIEC 61850
400 kV Bus 402.3 kV G 320MW Steam #1 G 450MW CCGT #1 H 180MW Hydro 200MVA 200MVA 132 kV Bus 133.5 kV +85MW Tie Line 63MVA 63MVA 40MVA 20 kV Bus 20.2 kV 45MW 52MW 38MW RE 95MW Solar+Wind
4,850
MW Total Gen
4,720
MW Total Load
+85
MW Tie Flow
130
MW Losses
0.92
Power Factor
45/48
CB Closed
🏭 Generation Dispatch

دیسپچ واحدهای تولید

Unit Commitment | Economic Dispatch | Merit Order | AGC Participation

🏭 Power Plants - Real-time Dispatch
✓ 12/14 OnlineAGC: 8 UnitsED Active
🏭
Steam #1
320MW | Gas | AGC
Output
285
Setpoint
290
Heat Rate
8,450
Inc Cost
1,250
🏭
CCGT #1
450MW | NG | AGC
Output
412
Setpoint
420
Heat Rate
7,200
Inc Cost
980
🏭
CCGT #2
500MW | NG | AGC
Output
468
Setpoint
475
Heat Rate
6,850
Inc Cost
920
💧
Hydro #1
250MW | Water | Spin
Output
180
Setpoint
180
Head
85m
Inc Cost
120
☀️
Solar PV
150MW | Variable
Output
95
Forecast
102
Irradiance
720
Curtail
0%
🌬️
Wind Farm
200MW | Variable
Output
142
Forecast
150
Wind
12m/s
Curtail
0%
🏭
Steam #2
280MW | Coal | Base
Output
265
Setpoint
265
Heat Rate
9,100
Inc Cost
1,450
🔥
GT Peaker
100MW | NG | Reserve
Output
0
Ramp
10min
Heat Rate
11,200
Inc Cost
2,100
🏭
Steam #3
280MW | Outage
Output
0
ETA
48h
Reason
Boiler
Status
FO
🔋
BESS
50MW/200MWh | Li-ion
Output
+25
SOC
72%
Mode
FR
Cycles
1,245
🏭
CCGT #3
400MW | NG | AGC
Output
385
Setpoint
390
Heat Rate
7,100
Inc Cost
950
💧
Hydro #2
180MW | Pump-Stor
Output
165
Mode
Gen
Reservoir
78%
Eff
82%
📊 Merit Order - Economic Dispatch
RankUnitCapacityInc CostCurrentDispatchAGCLoad %
1Hydro #1250 MW120 IRR180180
2CCGT #2500 MW920 IRR468475
3CCGT #3400 MW950 IRR385390
4CCGT #1450 MW980 IRR412420
5Steam #1320 MW1,250 IRR285290
6Steam #2280 MW1,450 IRR265265-
🔄 AGC/LFC

کنترل خودکار تولید

Automatic Generation Control | Load Frequency Control | Area Control Error

🔄 Frequency Control - AGC Mode
✓ AGC ActiveTie-Line BiasCPS1: 185%CPS2: 98%
50.02
Hz
System Frequency
49.0
UFLS
49.5
Alert
49.8
Low
50.0
Nominal
50.2
High
50.5
Alert
51.0
Trip
ACE+2.5 MW
Δf+0.02 Hz
ΔTie+0.5 MW
Bias-28 MW/0.1Hz
AGC Demand+8 MW
450
MW Spinning
200
MW Non-Spin
±50
MW Regulation
25
MW/min Ramp
<4s
Pri Response
<30s
Sec Response
<15m
Ter Response
185%
CPS1 Score
📡 WAMS/PMU

پایش گسترده سنکروفازور

Wide Area Measurement System | Phasor Measurement Units | IEEE C37.118

📡 Synchrophasor Network - 60 samples/sec
✓ 12/12 PMU OnlinePDC SyncGPS LockedTVE <1%
PMU-400-01
پست 400kV مرکزی
V: 402.3 kV
δ: 0.0°
f: 50.02 Hz
df/dt: +0.01
PMU-400-02
پست 400kV شمال
V: 401.8 kV
δ: -2.3°
f: 50.02 Hz
df/dt: +0.01
PMU-400-03
پست 400kV جنوب
V: 400.5 kV
δ: -4.1°
f: 50.01 Hz
df/dt: +0.00
PMU-GEN-01
نیروگاه CCGT #1
V: 21.2 kV
δ: +15.2°
P: 412 MW
Q: 85 MVAr
PMU-132-01
پست 132kV صنعتی
V: 133.5 kV
δ: -8.5°
f: 50.02 Hz
df/dt: +0.01
PMU-TIE-01
خط اتصال منطقه‌ای
P: +85 MW
Q: +12 MVAr
I: 245 A
δ: -1.2°
PMU-GEN-02
نیروگاه Hydro
V: 15.8 kV
δ: +22.5°
P: 180 MW
Q: -20 MVAr
PMU-132-02
پست 132kV غرب
V: 131.2 kV
δ: -12.3°
TVE: 0.8%
GPS: Drift
12
PMU Online
60
Samples/sec
<1%
TVE Max
±1μs
Time Sync
IEEE
C37.118
PDC
Concentrated
🛡️ Security Analysis

تحلیل امنیت شبکه

N-1 Contingency Analysis | State Estimation | Optimal Power Flow

🛡️ Contingency Analysis - Real-time
✓ N-1 SecureSE ConvergedOPF Active
Loss of CCGT #1
Secure
ΔFreq
-0.15 Hz
Reserve
450 MW
Recovery
45s
Loss of T1 400/132kV
Secure
Overload
T2: 92%
Voltage
0.97 pu
Action
None
Loss of Line 400-1
Marginal
Overload
L2: 98%
Voltage
0.95 pu
Action
Redispatch
Loss of Bus 400-C
Secure
Island
None
Load Loss
0 MW
Action
None
Loss of Hydro #1
Secure
ΔFreq
-0.08 Hz
Reserve
450 MW
Recovery
25s
Loss of Tie Line
Secure
ΔP
-85 MW
AGC
Pickup
Action
None
N-1
Security Level
156
Contingencies
152
Secure
4
Marginal
0
Insecure
5min
Cycle Time
⚠️ Load Shedding

طرح زوال بار

Under-Frequency Load Shedding | Under-Voltage Load Shedding | Black Start

⚠️ UFLS/UVLS Scheme - Armed
✓ All Stages ArmedAuto Mode6 Stages
49.0
Hz
5%
236 MW
● Armed
48.8
Hz
5%
236 MW
● Armed
48.6
Hz
5%
236 MW
● Armed
48.4
Hz
5%
236 MW
● Armed
48.2
Hz
5%
236 MW
● Armed
48.0
Hz
5%
236 MW
● Armed
30%
Total UFLS
1,416
MW Sheddable
0
Stages Tripped
200ms
Trip Time
df/dt
Adaptive
Black Start
Ready
🚨 Alarms

مدیریت هشدار

Real-time Alarm Management | Event Log | Disturbance Recording

🚨 Active Alarms
2 Critical5 Warning12 Info
14:32:15
Steam #3
Unit Forced Outage - Boiler tube leak detected
14:28:42
T2-132kV
Transformer Oil Temperature High - 78°C (Limit: 75°C)
14:25:18
Line 400-2
Line Loading 92% - Approaching thermal limit
14:22:33
PMU-132-02
GPS Time Drift Warning - Synchronization degraded
14:18:05
Sub-South
Voltage Low 0.95 pu - Below normal range
14:15:22
AGC
ACE deviation sustained - Manual review recommended
14:12:48
CCGT #1
Exhaust Temperature Approaching Limit - 615°C
14:10:15
AGC
Base point update sent to CCGT #2
14:08:33
SCADA
State Estimation converged - 2,450 measurements processed
14:05:00
ED
Economic Dispatch solution updated - Total cost: 4,250M IRR
2
Critical
5
Warning
12
Info
847
Today Total
DFR
Recording
SOE
1ms Resolution
📐 State Estimation

تخمین حالت شبکه

Weighted Least Squares | Bad Data Detection | Observability Analysis | Topology Processing

📐 State Estimator - Converged
✓ ConvergedWLS Method2,450 Measχ² = 1.02
Bus
V (pu)
δ (deg)
Residual
Quality
BUS-400-01
1.005
0.0°
0.0012
Good
BUS-400-02
1.002
-2.3°
0.0018
Good
BUS-400-03
0.998
-4.1°
0.0025
Good
BUS-132-01
1.008
-8.5°
0.0821
Suspect
BUS-132-02
0.985
-12.3°
0.0015
Good
BUS-20-01
1.012
-15.2°
0.0022
Good
BUS-20-02
1.005
-16.8°
0.0019
Good
BUS-20-03
0.995
-18.1°
0.1523
Bad Data
2,450
Measurements
1,824
State Variables
134%
Redundancy
3
Iterations
1.02
Chi-Square
2
Bad Data
100%
Observable
850ms
Solve Time
⚡ OPF

پخش بار بهینه

Security Constrained OPF | Loss Minimization | Congestion Management | Voltage Optimization

⚡ Optimal Power Flow - Active
✓ FeasibleSCOPF ModeMin Cost
Line 400-1 Flow
Binding
0 MW392/400 MW
CCGT #1 MW
Slack
100 MW412/450 MW
Bus 132-S Voltage
Binding
0.95 pu0.95/1.05 pu
T1 400/132 MVA
Slack
0 MVA160/200 MVA
Spinning Reserve
Slack
450 MW≥ 400 MW
Hydro Energy
Binding
0 MWh950/1000 MWh
Emission CO2
Slack
0 ton1,450/2,000 ton
Tie Line Flow
Slack
-200 MW+85/200 MW
4,250
M IRR/hr Cost
130
MW Losses
2
Binding Constraints
Feasible
Solution Status
SCOPF
Mode
1.2s
Solve Time
📉 VSA

تحلیل پایداری ولتاژ

P-V Curves | Q-V Curves | Voltage Collapse Margin | Modal Analysis

📉 Voltage Stability Analysis
✓ StableMargin 28%CPF Method
Loading Margin
28%
Critical Bus
BUS-132-S
Weakest Mode
λ = 0.082
Q Reserve
+450 MVAr
Nose Point
6,050 MW
28%
Load Margin
6,050
MW Max Load
132-S
Critical Bus
0.95
V Critical pu
CPF
Method
2.5s
Compute
⚡ TSA

تحلیل پایداری گذرا

Time Domain Simulation | Critical Clearing Time | Rotor Angle Stability | PSS Tuning

⚡ Transient Stability Analysis
✓ StableCCT: 180msRK4 Solver
0s
0.1s
0.5s
1.0s
5.0s
3φ Fault @ Bus 400-02
Fault Cleared 80ms
First Swing Peak 45°
Damped Oscillation
Stable Equilibrium
CCGT #1
+12.5°
● Stable
CCGT #2
+18.2°
● Stable
Hydro #1
+32.5°
● Swinging
Steam #1
+8.8°
● Stable
180
ms CCT
45°
Max Swing
5s
Sim Time
0.5ms
Time Step
PSS
Active
8%
Damping
🔀 Topology

پردازش توپولوژی شبکه

Bus-Branch Model | Switching Status | Island Detection | Connectivity Analysis

🔀 Network Topology Processor
✓ Connected1 Island912 Buses
G1
G2
H1
400
T1
T2
132
S1
S2
S3
L1
L2
L3
TIE
912
Buses
1,245
Branches
1
Islands
45/48
CB Closed
100%
Connected
50ms
Process
🎮 DTS

شبیه‌ساز آموزشی

Dispatcher Training Simulator | Scenario Replay | Real-time Simulation | Operator Certification

🎮 Dispatcher Training Simulator
✓ ReadyScenario Modex1 Speed
🖥️ DTS Control Room
SIM TIME: 14:32:15 | SPEED: x1
CCGT #1
412 MW
CCGT #2 ⚠️
TRIP
Hydro
180 MW
Frequency
49.85 Hz
⚠️ ALARM: CCGT #2 Generator Trip - Boiler Feed Pump Failure | AGC responding with +250 MW request | Spinning reserve activated
45
Scenarios
Real-time
Simulation
x0.1-x100
Speed Range
Replay
Mode
Instructor
Console
Cert
Ready
📡 SCADA

داده‌های SCADA Real-time

50,000+ Points | 1-Second Scan | IEC 61850 / IEC 104 / DNP3

📡 SCADA Point Browser
✓ 50,245 Points1s ScanQuality 99.8%
Tag NameDescriptionValueUnitQualityTimestampAlarm
SYS.FREQSystem Frequency50.02HzGood14:32:15.123-
GEN.CCGT1.MWCCGT #1 Active Power412.5MWGood14:32:15.089-
GEN.CCGT1.MVARCCGT #1 Reactive Power85.2MVArGood14:32:15.089-
BUS.400.V400kV Bus Voltage402.3kVGood14:32:15.045-
LINE.400-1.PLine 400-1 Power Flow392.1MWGood14:32:15.067⚠ High
XFM.T1.TAPTransformer T1 Tap+3posGood14:32:14.892-
CB.400-G1.STGenerator CB StatusCLOSED-Good14:32:15.012-
PMU.400-01.ANGPMU Voltage Angle0.0degGood14:32:15.016-
AGC.ACEArea Control Error+2.5MWGood14:32:15.001-
SUB.132-S.TEMPSub South Temp78.5°CSuspect14:32:14.234🔴 Crit
📊 CIM

مدل داده CIM

IEC 61970/61968 | Common Information Model | Data Exchange

📊 CIM Data Model - IEC 61970
✓ CompliantCIM 17
GeneratingUnit
• mRID: string
• name: string
• maxOperatingP: MW
• minOperatingP: MW
• genControlSource: enum
🔌
PowerTransformer
• mRID: string
• name: string
• ratedS: MVA
• highVoltage: kV
• lowVoltage: kV
📡
ACLineSegment
• mRID: string
• length: km
• r: ohm/km
• x: ohm/km
• bch: S/km
🏢
Substation
• mRID: string
• name: string
• region: SubRegion
• voltageLevels: VL[]
📊
Measurement
• mRID: string
• measurementType: enum
• unitSymbol: enum
• Terminal: ref
🔀
Breaker
• mRID: string
• normalOpen: bool
• ratedCurrent: A
• breakingCapacity: kA
🔗 Integration

یکپارچگی سیستم‌ها

Enterprise Integration | GIS | OMS | DMS | Market | WAMS

🔗 System Integration Hub
✓ 8/10 ConnectedESB Active
🖥️
EMS/SCADA
IEC 61850
🗺️
GIS
CIM/XML
⚠️
OMS
MultiSpeak
🏠
DMS
IEC 61968
📈
Market
REST API
📡
WAMS/PDC
C37.118
📊
Historian
OPC-UA
💼
ERP/SAP
RFC/BAPI
🔋
DERMS
OpenADR
📱
Mobile
REST/WS
⚙️ Subsystems

۱۸ زیرسیستم EMS/SCADA

Enterprise-grade Energy Management System | Comparable to Siemens Spectrum Power & ABB Network Manager

مدیریت تولید
Generation Management
Unit Commitment، Economic Dispatch، Merit Order، Startup/Shutdown Optimization، Fuel Management
UCEDSCEDMerit OrderFuel Mgmt
14 نیروگاه5,200 MW
🔄
کنترل فرکانس AGC
AGC/LFC
Automatic Generation Control، Load Frequency Control، ACE، Tie-Line Bias، CPS1/CPS2 Compliance
AGCLFCACESpinningRegulation
50.0 Hz<4s Response
📊
پیش‌بینی بار
Load Forecasting
STLF/MTLF/LTLF، Neural Network، Weather Integration، Pattern Recognition، Demand Response
STLFMTLFAI/MLWeatherDR
98.5% MAPE15min Resolution
🔌
کنترل ولتاژ/توان راکتیو
Volt/VAR Control
AVR، OLTC Control، Capacitor Banks، SVC/STATCOM، Reactive Power Optimization
AVROLTCSVCCap BankRPO
±5% V Dev0.92 PF
🛡️
تحلیل امنیت شبکه
Security Analysis
N-1/N-2 Contingency، State Estimation، Optimal Power Flow، Stability Analysis
CASEOPFVSATSA
N-1 Secure156 Contingency
📡
WAMS/PMU
Wide Area Measurement
Synchrophasor، Phasor Data Concentrator، Oscillation Detection، Islanding Detection
PMUPDCC37.118GPS60Hz
12 PMU<1% TVE
⚠️
طرح زوال بار
Load Shedding
UFLS/UVLS، Adaptive Relay، df/dt Protection، Special Protection Scheme
UFLSUVLSSPSRASAdaptive
30% Shed200ms Trip
🔥
Black Start
System Restoration
Cranking Path، Island Synchronization، Step-by-Step Restoration، Training Simulator
Crank PathSyncIslandDTSDrill
4 BS Units<4h Full Rest
☀️
یکپارچگی تجدیدپذیر
Renewable Integration
Solar/Wind Forecasting، Ramp Control، Curtailment، Virtual Power Plant، DER Management
SolarWindVPPDERCurtail
350 MW RE15% Penetration
🔋
ذخیره‌سازی انرژی
Energy Storage
BESS Management، Pumped Hydro، Peak Shaving، Frequency Response، Arbitrage
BESSPSHV2GFRArbitrage
250 MWh<1s Response
📈
بازار برق
Energy Market
Day-Ahead/Real-Time Market، Ancillary Services، Settlement، Bidding Optimization
DAMRTMASSettlementBid
24/7 Trading15min Interval
🖥️
SCADA/RTU
Control System
Data Acquisition، Remote Control، Protocol Gateway، Historian، Trending
RTUIED61850104DNP3
50K+ Points1s Scan
🚨
مدیریت هشدار
Alarm Management
Alarm Filtering، Priority، Suppression، Correlation، Root Cause Analysis
FilterPriorityRCASuppressISA 18.2
<10/hr ActiveASM Compliant
📝
ثبت رویداد/اختلال
Event/Disturbance Rec
SOE، DFR، Fault Analysis، Oscillography، Post-Mortem Analysis
SOEDFRCOMTRADEFault1ms
1ms Resolution30d Storage
📡
ارتباطات
Telecom Infrastructure
Fiber/OPGW، Radio، PLC، Redundancy، Network Management، Cybersecurity
FiberOPGWRadioPLCNMS
99.99% Uptime<10ms Latency
🛡️
امنیت سایبری
Cybersecurity
ICS Security، Firewall، IDS/IPS، Access Control، NERC CIP، ISO 27001
FirewallIDSSIEMSOCCIP
24/7 MonitorISO 27001
📋
مدیریت خاموشی
Outage Management
Outage Scheduling، Switching Orders، Crew Management، Safety Tagging
ScheduleSwitchingTagCrewSafety
365 DaysAuto Schedule
📊
گزارش و تحلیل
Reporting & Analytics
KPI Dashboard، Regulatory Reports، Performance Analytics، Business Intelligence
KPIBIAnalyticsComplianceExport
100+ ReportsAuto Generate
📊 Dashboard

داشبورد نمونه EMS

4,850
MW Generation
4,720
MW Demand
50.02
Hz Frequency
130
MW Reserve
+85
MW Tie Flow
+0.02
ACE MW
4.2%
Losses
N-1
Security
📈 Load Curve - Today
⚡ Generation Mix
🔄 Frequency
📊 System Status
AGC Active
N-1 Secure
1 Outage
SCADA OK
12 PMU Sync
SE Converged
12
Units Online
4,850
MW Total
89%
Avg Load
7,200
Heat Rate
450
MW Spinning
4,250
M IRR Cost
95.8%
Efficiency
8
AGC Units
50.02
Hz Current
+0.02
ACE MW
Auto
AGC Mode
±50
Regulation
-28
Bias
<4s
Response
185%
CPS1
98%
CPS2
N-1
Security
156
Contingencies
152
Secure
4
Marginal
0
Insecure
SE
Converged
OPF
Active
5min
Cycle
🎨 Designer

طراحی داشبورد

🎨 EMS Dashboard Designer
4,850
MW Gen
4,720
MW Load
50.02
Hz
N-1
Security
⚡ Frequency
📐 Properties
Widget
Freq KPI
X
Y
📊 Data
Tag
⚙️ Logic

طراحی منطق حفاظتی

UnsavedUFLS-STAGE1-001Phoenix Editor
📋 Properties
Name
UFLS Stage 1
Trigger
f < 49.0 Hz
Priority
Critical
Response
<200ms
⚡ TRIGGER
f < 49.0 Hz
Under-frequency
❓ CONDITION
t > 200ms
Time delay
⚡ ACTION
Shed 5%
236 MW
📧 ACTION
Alert
SCADA+SMS
Toolbox
Drag to canvas
TRIGGERS
Frequency
🔌
Voltage
📊
Overload
🔥
Thermal
CONDITIONS
⏱️
Time Delay
📊
Threshold
🔀
AND/OR
ACTIONS
Load Shed
🏭
Gen Ctrl
🔌
CB Trip
📧
Alert
🔢 ENID

آدرس‌دهی یکتای تجهیزات

Equipment Naming & Identification | IEC 81346 Compatible

PWR
System
-
Z05
Zone
-
SUB
Substation
-
TR01
Transformer
-
IED
Device
-
001
Point
Power System
IEC 81346 Compliant
🏢
Substation ID
Hierarchical Structure
🔌
IEC 61850
LN/DO/DA Mapping
📡
SCADA Tag
Auto Generation
🔥 Phoenix

پلتفرم Phoenix EMS

Enterprise Energy Management Platform | IEC 61850/61968/61970 Compliant

🖥️
Phoenix DCS
Control Center Server
Points100,000+
Scan100ms-1s
Protocol61850/104/DNP3
RedundancyActive-Standby
CIMIEC 61970
📡
Phoenix RTU
Substation Gateway
I/O256 DI/DO/AI
Response<10ms
Protocol61850 Client
CommFiber/Radio/4G
CyberIEC 62351
Phoenix IED
Protection & Control
Functions21/50/51/67/87
Trip<20ms
GOOSE<4ms
AccuracyClass 0.2S
StandardIEC 61850 Ed2